north-south corridor

Location

Singapore

client

Land Transport Authority, Singapore

services

Project Management & Design Management

The 21.5km long North-South Corridor (NSC) runs along the existing road corridor between ECP and Admiralty Road West. It will have grade-separated carriageways on the viaduct and tunnel and will largely be dual 3-lanes; except for the stretch of CTE and PIE where it will be dual 4-lanes. The NSC, also feature bus priority and active mobility measures. The tunnel section of the NSC is 12.3km long. For operation of the tunnel, five facility buildings will be provided at Ang Mo Kio Town Garden West, Marymount Road, PIE (Thomson Flyover), Kampong Java Road and Nicoll Highway. The remaining 9.2km is elevated viaduct and at-grade roads.

Asia Infrastructure Solutions is providing project management and design management services, independent engineering checking of existing structural and geotechnical design, reviewing of ST submissions, pile load test report and pile design parameters

Delivering project management services for Singapore’s longest Transit Priority Corridor to ensure smoother, faster journeys for commuters.

North South Corridor

Recent News

Global Infrastructure Solutions Inc appoints Barry Sum as Chief Executive Officer of Asia Infrastructure Solutions

Barry Sum has been appointed as the Chief Executive Officer of AIS, a Global Infrastructure Solutions Inc (GISI) company. For a comprehensive overview of this exciting development, we invite you to read the official press release.

Wong Heang Fine Joins GISI as Chairman of Asia Infrastructure Solutions Singapore & Director of Asia Advisory Board

Wong Heang Fine has joined Global Infrastructure Solutions Inc. (GISI) in the pivotal roles of Chairman of Asia Infrastructure Solutions Singapore and Director of GISI’s Asia Advisory Board.

Submit your details below and we will let you know once Asia Infrastructure Solutions publishes.

Copyright © 2023 Asia Infrastructure Solutions