MTR SHATIN TO CENTRAL LINK CONTRACT 1121 - CROSS HARBOUR TUNNELS​

Location

Hong Kong

client

Penta-Ocean – China State Joint Venture
(Ultimate Client: MTR Corporation Limited)

services

Lead Engineering Design Consultant to Contractor

MTR Shatin to Central Link Contract 1121 – Cross Harbour Tunnels is a design and build contract of 1.66km of Immersed tube tunnel (IMT) between Hung Hom and Causeway Bay.  The IMT prefabrication was carried out in one batch of 11 units in Shek O and was installed across the busy Victoria Harbour and inside the Causeway Bay Typhoon Shelter.

Asia Infrastructure Solutions Limited provided lead detailed design of permanent and major temporary works for the subsea railway crossing. Our design responsibility encompasses the design of the cut-and-cover tunnels at the Hung Hom landfall area, the immersed tube tunnels across the Victoria Harbour between the tunnels at the Hung Hom Landfall and the tunnels at Causeway Bay Typhoon Shelter as well as the casting basin at Shek O.

MTR Shatin to Central Link Contact 1121- Cross Harbour Tunnels

Recent News

Global Infrastructure Solutions Inc appoints Barry Sum as Chief Executive Officer of Asia Infrastructure Solutions

Barry Sum has been appointed as the Chief Executive Officer of AIS, a Global Infrastructure Solutions Inc (GISI) company. For a comprehensive overview of this exciting development, we invite you to read the official press release.

Wong Heang Fine Joins GISI as Chairman of Asia Infrastructure Solutions Singapore & Director of Asia Advisory Board

Wong Heang Fine has joined Global Infrastructure Solutions Inc. (GISI) in the pivotal roles of Chairman of Asia Infrastructure Solutions Singapore and Director of GISI’s Asia Advisory Board.

Submit your details below and we will let you know once Asia Infrastructure Solutions publishes.

Copyright © 2023 Asia Infrastructure Solutions