NORTH-SOUTH CORRIDOR
LOCATION
Singapore
CLIENT
Land Transport Authority, Singapore
SERVICES
Project Management, Design Management, Cost Management
The 21.5km long North-South Corridor (NSC) runs along the existing road corridor between ECP and Admiralty Road West. It will have grade-separated carriageways on the viaduct and tunnel and will largely be dual 3-lanes; except for the stretch of CTE and PIE where it will be dual 4-lanes. The NSC, also feature bus priority and active mobility measures. The tunnel section of the NSC is 12.3km long. For operation of the tunnel, five facility buildings will be provided at Ang Mo Kio Town Garden West, Marymount Road, PIE (Thomson Flyover), Kampong Java Road and Nicoll Highway. The remaining 9.2km is elevated viaduct and at-grade roads.
AIS-Hill and Asia Infrastructure Solutions (AIS) are providing project and cost management, design management services, independent engineering checking of existing structural and geotechnical design, reviewing of ST submissions, pile load test report and pile design parameters.
COLLABORATED WITH OVER 30 GOVERNMENTAL STAKEHOLDERS AND 15,000 RESIDENTS TO UNDERSTAND AND ADDRESS THEIR INTERESTS TO INTEGRATE INTO THE DEVELOPMENT DESIGN.