INTEGRATED WASTE MANAGEMENT FACILITIES, PHASE 1
LOCATION
Hong Kong
CLIENT
Keppel Seghers – Zhen Hua Joint Venture (Ultimate client: The Environmental Protection Department)
SERVICES
Lead Engineering Design Consultant to Contractor
The Integrated Waste Management Facilities consist of an advanced incineration facility and a demonstration scale plant for the recovery of recyclables. Phase 1 of the Facilities could deal with a daily incineration treatment capacity of 3,000 tonnes and a recycling capacity of 200 tonnes.
Asia Infrastructure Solutions Limited is the lead engineering consultant to provide designs for prefabricated seawalls and breakwater (to minimise impacts to marine environment), civil infrastructure, reclamation, building structures, building services, a chimney structure of around 150m tall and also leading a team for the architectural, landscape architectural, wind tunnel testing and other specialists.


